Recently Completed Project
-
Sheyenne Street Reconstruction
The three-year Sheyenne Street corridor reconstruction project is scheduled to begin 2018. This project will ease congestion and safety concerns in West Fargo by redoing the Interstate 94 interchange and adding lanes to Sheyenne Street from 13th to 40th Avenues W.
Link to page -
Kensington Drive - Hidden Circle Connection
Connection of Kensington Drive to Hidden Circle to allow for entrance to Kensington Drive.
Link to page -
Eagle Run Plaza Sixth Addition
Eagle Run Plaza Sixth Addition
Link to page -
The Wilds Projects
Information regarding local and regional projects in The Wilds development.
Link to page -
Halverson Pond and Halverson's Industrial Park
Information regarding project to install storm sewer and a storm water pond to service and provide regional retention for the Halverson Industrial Park and surrounding area.
Link to page -
Geller's and Meadow Ridge Area Sewer Improvements
The reason for the improvements is to reroute the existing sanitary sewer force main from existing sanitary lift station SA-11 to avoid the Brookwood area, reroute the existing gravity sanitary sewer that services the Geller’s area with a new lift station to avoid the Brookwood area, modifying existing sanitary lift stations SA-11 and SA-47 to accommodate the change in flow due to this rerouting, and moving the location of the existing compost site.
Link to page -
Pioneer Place Alley Utility Improvements
Information regarding the replacement of the sanitary sewer and storm sewer in the alley between Sheyenne Street and Morrison Street for the block north of Fourth Avenue. W.
Link to page -
Highland Meadows First and Second Additions
Infrastructure for Highlands First and Second Additions development
Link to page -
South Regional Sanitary Sewer Redundancy Forcemain
This project will complete the last phase of the work for the South Regional Sanitary Lift Station by installing the redundant sanitary sewer force main for the city wastewater service area south of Interstate 94.
Link to page -
Brooks Harbor Water Tower
Construction of an elevated water storage tank in the Brooks Harbor development to increase the water system reliability and provide additional operational and maintenance flexibility.
Link to page
-
West Fargo Streets
Phone: (701) 433-5430