105.6.2 Amusement buildings | $60/Annually |
105.6.36 Places of Assembly (outdoor) | $60/Per Event |
105.6.8 Combustible gases | $60/Annually |
105.6.10 Cryogenic fluids | $60/Annually |
105.6.12 Dry cleaning w/hazardous solvent | $60/Annually |
105.6.13 Exhibits and trade shows | $60/Per Event |
105.6.14 Explosives | $60/Annually |
105.6.16 Flammable and combustible liquids | $60/Annually |
105.6.20 Hazardous materials | $120/Annually |
105.6.21 HPM facilities | $120/Annually |
105.6.22 High piled storage(exceeding 500ft2) | $60/Annually |
105.6.25 Lumber yards and woodworking plants >100,000bf | $60/Annually |
105.6.26 Liquid or gas fueled vehicles or equipment in assembly areas | $60/Annually |
105.6.27 LP-gas 6101.2 | $60/Annually |
105.6.28 Magnesium (>10lbs) | $60/Annually |
105.32 Open burning | $60/Per Burn |
105.6.34 Open flames and candles | $60/Annually |
105.6.37 Places of assembly | $60/Annually |
105.6.40 Pyrotechnic special effects materials | $120.00 +$ 85/hr min. 2 hrs./Annually |
105.6.41 Pyroxylin plastics | $60/Annually |
105.6.44 Rooftop heliports | $60/Annually |
105.6.45 Spraying or dipping | $60/Annually |
105.6.46 Storage of scrap tires | $60/Annually |
105.6.47 Temporary membrane structures and tents | $60/Annually |
105.6.48 Tire rebuilding plants | $60/Annually |
901.2 Automatic fire-extinguishing systems (Plan review and inspection) no permit | $85 + ($1x0.1%(Total fire flow calculation area)) |
105.7.5 Cryogenic Fluids | $85 + (0.1%(Project cost)) |
105.7.6 Emergency Responder radio coverage system | $85 + (0.1%(project cost)) |
105.7.1 Fire alarm and detection system and related equipment (Plan review and inspection) no permit | $85 + ($1x0.1%(Total Project Cost)) |
105.7.9 Flammable and combustible liquids | $85 + (1%(Project cost)) |
105.7.10 Fuel cell power systems | $85 + (1%(Project cost)) |
105.7.13 Hazardous materials | $85 + (0.1%(Project cost)) |
105.7.11 Industrial ovens | $85 + (0.1%(Project cost)) |
105.7.16 LP-gas | $85 + (0.1%(Project cost)) |
105.7.23 Spraying or dipping | $85 + (0.1%(Project cost)) |