Operational Permit Fee Schedule

105.6.2 Amusement buildings$60/Annually
105.6.36 Places of Assembly (outdoor)$60/Per Event
105.6.8 Combustible gases$60/Annually
105.6.10 Cryogenic fluids$60/Annually
105.6.12 Dry cleaning w/hazardous solvent$60/Annually
105.6.13 Exhibits and trade shows$60/Per Event
105.6.14 Explosives$60/Annually
105.6.16 Flammable and combustible liquids$60/Annually
105.6.20 Hazardous materials$120/Annually
105.6.21 HPM facilities$120/Annually
105.6.22 High piled storage(exceeding 500ft2)$60/Annually
105.6.25 Lumber yards and woodworking plants >100,000bf$60/Annually
105.6.26 Liquid or gas fueled vehicles or equipment in assembly areas$60/Annually
105.6.27 LP-gas 6101.2$60/Annually
105.6.28 Magnesium (>10lbs)$60/Annually
105.32 Open burning$60/Per Burn
105.6.34 Open flames and candles$60/Annually
105.6.37 Places of assembly$60/Annually
105.6.40 Pyrotechnic special effects materials$120.00 +$ 85/hr min. 2 hrs./Annually
105.6.41 Pyroxylin plastics$60/Annually
105.6.44 Rooftop heliports$60/Annually
105.6.45 Spraying or dipping$60/Annually
105.6.46 Storage of scrap tires$60/Annually
105.6.47 Temporary membrane structures and tents$60/Annually
105.6.48 Tire rebuilding plants$60/Annually


Construction Permits Fee Schedule

901.2 Automatic fire-extinguishing systems (Plan review and inspection) no permit
$85 + ($1x0.1%(Total fire flow calculation area))
105.7.5 Cryogenic Fluids
$85 + (0.1%(Project cost))
105.7.6 Emergency Responder radio coverage system
$85 + (0.1%(project cost))
105.7.1 Fire alarm and detection system and related equipment
(Plan review and inspection) no permit
$85 + ($1x0.1%(Total Project Cost))
105.7.9 Flammable and combustible liquids
$85 + (1%(Project cost))
105.7.10 Fuel cell power systems
$85 + (1%(Project cost))
105.7.13 Hazardous materials
$85 + (0.1%(Project cost))
105.7.11 Industrial ovens
$85 + (0.1%(Project cost))
105.7.16 LP-gas
$85 + (0.1%(Project cost))
105.7.23 Spraying or dipping
$85 + (0.1%(Project cost))